Schedule & Locations

Schedule and locations subject to change. Timeframes are estimated and are based on the expected difficulty in getting data cables installed to access-point locations. Projects with multiple objectives (i.e. locations) may come on-line as the project progresses.

Areas surrounding the locations below may also have wireless coverage. Additional areas will continually be added as time and funding permits.

In the map below, locations highlighted in green show the approximate coverage areas.  See the accompanying chart for details.

The College has awarded a contract to an engineering firm to complete the design of the wireless in the remaining buildings listed below. It is expected that an engineering firm will complete their work in late February 2016. A bid will be issued for construction and awarded in late April 2016. Installation will commence with the bid award and focus on the remaining residential and academic spaces as a priority.

Building Timeframe for
Full Wireless
Current Hotspot Location(s)
Amstrong Hall Done Entire building
Art/IMM Building Done Entire building
ASB Summer/Fall 2016
CURRENT HOTSPOTS: HR conference room and ASB 103 & 203 conference rooms
Bliss Hall Done Entire building has coverage
Bliss Hall Annex Done Entire annex building has coverage
Brower Student Center Included in renovation CURRENT HOTSPOTS: Rooms 202 East & West, Atrium, Lion’s Den, Student Organization Suite, Conference Room of the VP for Student Affairs
Centennial Hall Done Entire building has coverage
College Houses Done CURRENT HOTSPOTS: Carlton 46, 60, 62 and 1884 Pennington
Cromwell Hall Done Entire building has coverage
Decker Hall Done Entire building has coverage
Education Building Done Entire building has coverage
Eickhoff Hall Done Entire building has coverage
Ely/Allen/Brewster Halls Done Entire building has coverage
Facilities & Powerhouse Summer/Fall 2016
Forcina Hall Done  Entire building has coverage
Green Hall Summer/Fall 2016 CURRENT HOTSPOTS: Green Hall basement & 107 suite, President’s conference room
Kendall Hall Summer/Fall 2016 CURRENT HOTSPOTS: Blackbox Lounge
Loser Hall Done Entire building has coverage
Music Building Done Entire building has coverage
New Residence Hall Done Entire building has coverage
Norsworthy Hall Done
Entire building has coverage including some adjacent outdoor areas
Packer Hall Summer/Fall 2016 CURRENT HOTSPOTS: Lounge & Pool Area
Phelps & Hausdoerffer Halls Done Entire buildings and courtyards have coverage
Rec. Center Summer/Fall 2016 CURRENT HOTSPOTS: Open (indoor tennis court) areas used for events
Roscoe West Hall Summer/Fall 2016 CURRENT HOTSPOTS: ’68 Swing Space
School of Business Building Done Entire buildings and courtyards have coverage
Science Complex – Biology Done Entire building has coverage
Science Complex – Chemistry Done Entire building has coverage
Science Complex – Physics+Math Done Entire building has coverage
Social Science Done Entire building has coverage
Spritual Center Summer/Fall 2016
TCNJ Library Done Entire building has coverage
Townhouses East Summer/Fall 2016 CURRENT HOTSPOTS: Main Lounge
Townhouses West Summer/Fall 2016 CURRENT HOTSPOTS: Main Lounge
Townhouses South Summer/Fall 2016 CURRENT HOTSPOTS: Main Lounge
Travers Hall Summer/Fall 2016 CURRENT HOTSPOTS: T-Dubbs
Wolfe Hall Summer/Fall 2016 CURRENT HOTSPOTS: T-Dubbs, Link